CCNA 4 Chapter 1 v5.0 Exam Answers

CCNA 4 Chapter 1 v5.0 Exam Answers 2014

CCNA 4 Chapter 1

 

1.
What are two structured engineering principles necessary for successful implementation of a network design? (Choose two.)
quality of service
availability
security
resiliency
modularity

____________________________________________________________________
2
What is an important first consideration when starting to design a network?
access security
size of the network
protocols to be used
type of applications
____________________________________________________________________
3
Which two devices would commonly be found at the access layer of the hierarchical enterprise LAN design model? (Choose two.)
modular switch
access point
Layer 3 device
firewall
Layer 2 switch
____________________________________________________________________
4
A network engineer wants to redesign the wireless network and make use of wireless network controllers that manage the many deployed wireless access points. In which network design module of the campus network architecture would the centralized wireless network controllers be found?
enterprise edge
access-distribution
services
data center
____________________________________________________________________
5

Refer to the exhibit. Which type of Cisco hierarchical LAN design model is used at school site 1?
7 layer
three-tier
3 layer
two-tier collapsed core
____________________________________________________________________
6
In a hierarchical network design, which layers may be combined into a collapsed core for smaller networks?
core, distribution, and access
distribution and access
core and access
core and distribution
____________________________________________________________________
7
The network design for a college with users at five sites is being developed. Where in the campus network architecture would servers used by all users be located?
access-distribution
services
enterprise edge
data center
____________________________________________________________________
8
What is one advantage to designing networks in building block fashion for large companies?
redundancy
increased network access time
failure isolation
mobility
____________________________________________________________________
9
What is creating a new challenge for IT departments by changing the border of the enterprise network?
energy costs
company-owned desktops
access layer switching
tablets
____________________________________________________________________
10
Fill in the blank. Use the abbreviation.
Under the Cisco Enterprise Edge module, the submodule that provides remote access including authentication and IPS appliances is the and remote access submodule.
VPN
____________________________________________________________________
11
Which approach in networking allows for network changes, upgrades, or the introduction of new services in a controlled and staged fashion?
modular
borderless
static
network module
____________________________________________________________________
12
Refer to the exhibit. Which type of ISP connectivity to the service provider edge is being used by company A?
dual-homed
dual-multihomed
multihomed
single-homed
____________________________________________________________________
13
Which three network architectures have been introduced by Cisco to address the emerging technology challenges created by the evolving business models? (Choose three.)
Cisco Enterprise Campus
Cisco Enterprise Branch
Cisco Enterprise Edge
Cisco Borderless
Cisco Data Center
Cisco Collaboration
____________________________________________________________________
14
Which network module is the fundamental component of a campus design?
services module
access-distribution module
enterprise edge
data center

 

 

CCNA 4 Chapter 1,ccna

CCNA 4 

cana 4 chapter 3 answers 2013

Take Assessment – EWAN Chapter 3 – CCNA Exploration: Accessing the WAN (Version 4.0) - Answers – 2012 – 2013

 
cana 4 chapter 3 answers 2013

cana 4 chapter 3 answers 2013

1. Which three actions might a Frame Relay switch perform when it detects an excessive build-up of frames in its queue? (Choose three.)
puts a hold on accepting frames in excess of the CIR
drops frames from the queue that have the DE bit set
reduces the number of frames it sends over the link
re-negotiates flow control with the connected device
sets the FECN bit on all frames it receives on the congested link
sets the BECN bit on all frames it places on the congested link
2. Which best describes the benefit of using Frame Relay as opposed to a leased line or ISDN service?
Customers can define their virtual circuit needs in far greater combinations, with increments as small as 64 kbps.
Customers pay for an end-to-end connection that includes the local loop and the network link.
Customers only pay for the local loop and the bandwidth they purchase from the network provider.
Connecting new sites requires new lower cost circuit installations when compared to ISDN dialup costs or adding additional hardware for leased service.
3.
cana 4 chapter 3 answers 2013
Refer to the exhibit. Router R1 has been configured for Frame Relay connectivity to routers R2 and R3. What configuration option should be configured on the R2 and R3 serial interfaces in order for all routers to ping each other successfully?
R2(config-if)# frame-relay interface-dlci 201 broadcast
R3(config-if)# frame-relay interface-dlci 301 broadcast
R2(config-if)# frame-relay map ip 10.1.1.1 201 broadcast
R3(config-if)# frame-relay map ip 10.1.1.1 301 broadcast
R2(config-if)# frame-relay map ip 10.1.1.3 201 broadcast
R3(config-if)# frame-relay map ip 10.1.1.2 301 broadcast
R2(config-if)# frame-relay map ip 10.1.1.1 201 broadcast
R2(config-if)# frame-relay map ip 10.1.1.3 201 broadcast
R3(config-if)# frame-relay map ip 10.1.1.1 301 broadcast
R3(config-if)# frame-relay map ip 10.1.1.2 301 broadcast
4. Which two items allow the router to map data link layer addresses to network layer addresses in a Frame Relay network? (Choose two.)
ARP
RARP
Proxy ARP
Inverse ARP
LMI status messages
ICMP
5.
cana 4 chapter 3 answers 2013
Refer to the exhibit. Which two outcomes occur from the configuration shown? (Choose two.)
The broadcasts will be forwarded to 10.1.1.1.
The router will use DLCI 22 to forward data to 10.1.1.1.
DLCI 22 will replace the MAC address in the ARP table for entry 10.1.1.1
Inverse-ARP will now add an entry for 10.1.1.1 into the Frame Relay map table using DLCI 22.
Frames sent by 10.1.1.1 arriving on interface serial 0/0/0 of RT_1 will have a data link layer address of 22.
6. Refer to the exhibit. What can be determined about the Frame Relay switch from the output shown?
It is currently not transmitting data.
It is in the process of establishing the PVC.
It has put a hold on processing frames in excess of the CIR.
It is experiencing congestion.
7.
cana 4 chapter 3 answers 2013
Refer to the exhibit. What can be determined from the output?
Serial 0/0/0 has been configured with an DLCI of 201.
Serial 0/0/0 has the feature frame-relay inverse-arp enabled.
Serial 0/0/0 has been configured with an IP address of 172.16.4.3.
Serial 0/0/0 has been configured with the command frame-relay map ip 172.16.4.3 201 broadcast.
8.
071 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. What effect does the point-to-point configuration on subinterface S0/0.110 have on the operation of the router?
It helps to conserve IP addresses.
It establishes multiple PVC connections to multiple physical interfaces.
It eliminates split horizon issues without increasing the likelihood of routing loops.
It requires the configuration of the encapsulation command on the subinterface.
9.
161 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. Which statement explains why the Frame Relay connection between R1 and R2 is failing?
Split horizon must be disabled.
The LMI type must be specified.
Logical subinterfaces must be used instead.
The frame-relay map commands are using incorrect DLCIs.
10. What best describes the use of a data-link connection identifier (DLCI)?
local address identifying a destination router across a Frame Relay network
locally significant address used to identify a virtual circuit
logical address identifying the interface between a router and a Frame Relay switch
logical address used to identify the DCE
11.
171 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. Router R1 has been configured for Frame Relay connectivity to routers R2 and R3. Which set of configuration options for routers R2 and R3 would provide each router connectivity to R1?
R2(config)# interface serial0/0/1
R2(config-if)# frame-relay map ip 10.1.1.1 102
R3(config)# interface serial0/0/1
R3(config-if)# frame-relay map ip 10.1.2.1 103
R2(config)# interface serial0/0/1
R2(config-if)# frame-relay map ip 10.1.1.1 102
R2(config-if)# frame-relay map ip 10.1.2.3 301
R3(config)# interface serial0/0/1
R3(config-if)# frame-relay map ip 10.1.2.1 103
R3(config-if)# frame-relay map ip 10.1.1.2 201
R2(config)# interface serial0/0/1.201 point-to-point
R2(config-if)# no frame-relay invers-arp
R3(config)# interface serial0/0/1.301 point-to-point
R3(config-if)# no frame-relay invers-arp
R2(config)# interface serial0/0/1.201 point-to-point
R2(config-if)# frame-relay interface-dlci 201
R3(config)# interface serial0/0/1.301 point-to-point
R3(config-if)# frame-relay interface-dlci 301
12.
121 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. Frame Relay connectivity has been configured in the network and OSPF is used as the routing protocol. Router R1 can successfully ping the router R2 serial interface. When R1 attempts to ping network 192.168.3.0/24 the ping fails. What additional configuration should be applied on all routers to remedy the problem?
Add the broadcast keyword in the Frame Relay map command on both routers.
Issue the frame-relay interface-dlci command in addition to the frame-relay map command on both router interfaces.
Remove the frame-relay map command and replace with the frame-relay interface-dlci command on both router interfaces.
Apply the no frame-relay inverse-arp command on both router interfaces.
13. Which statement about Frame Relay subinterfaces is correct?
Multipoint interfaces will automatically forward routing broadcasts but will consume more IP addresses than point-to-point subinterfaces will consume.
Point-to-point subinterfaces act like leased lines and eliminate split-horizon routing issues.
Interfaces with multiple PVCs require a separate subinterface for each PVC.
Multipoint configurations cannot use subinterfaces.
14.
1911 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. What can be determined about the configuration of router R1 from the exhibited output?
LMI updates are not being received properly.
The LMI type for the Serial 0/0/0 interface has been left to its default configuration.
Cisco HDLC is used as a Layer 2 encapsulation protocol on the Serial 0/0/0 interface.
The Serial 0/0/0 interface has been configured as a data communications equipment device.
15. What is created between two DTEs in a Frame Relay network?
ISDN circuit
limited access circuit
switched parallel circuit
virtual circuit
16. Which Frame Relay topology is a compromise of costs, reliability, and complexity when the WAN contains one headquarters site, 40 regional sites, and several sites within each regional site?
star
full mesh
partial mesh
point-to-multipoint
point-to-point
17.
06 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. A ping is sent to address 192.168.50.10 from the Peanut router. Which DLCI will be used to send the ping?
110
115
220
225
18. What two methods does Frame Relay technology use to process frames that contain errors? (Choose two.)
Frame Relay services depend on the upper layer protocols to handle error recovery.
It requires the receiving device to request that the sender retransmit erroneous frames.
FECN, BECN, and DE bits are set in the frames to minimize errors.
The receiving device drops any frames that contain errors without notifying the sender.
The frame relay switch notifies the sender that errors were detected.
19.
091 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. Which two statements are true given the output shown? (Choose two.)
The IP address of the local Frame Relay interface is 172.16.1.4.
The local DLCI number is 401.
Inverse ARP is being used on this connection.
This interface is in the active state and in the process of negotiating configuration parameters.
Multicast is not enabled on this connection.
20.
182 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. What can be known about the configuration of router R1 from the output?
The Frame Relay LMI DLCI has been incorrectly configured as DLCI 1023.
The Frame Relay LMI type has been changed from its default.
The Serial 0/0/0 interface has been configured as a data communications equipment device.
The command encapsulation frame-relay ietf has been used on the Serial 0/0/0 interface.
21. What consideration must be taken into account if RIP is used on Frame Relay multiaccess networks?
To forward routing updates, address-to-DLCI mapping must be done via the use of the frame-relay map command coupled with the broadcast keyword.
Inverse ARP must be enabled to turn routing update broadcasts into unicast traffic that can be propagated to other Frame Relay nodes.
Because broadcast traffic is not supported, RIPv1 cannot be implemented on Frame Relay networks.
To forward broadcast routing updates, dynamic mapping must be enabled.
22.
141 EWAN Chapter 3 CCNA 4 4.0 2012 2013 100%
Refer to the exhibit. You are a network administrator who has been tasked with completing the Frame Relay topology that interconnects two remote sites. Router HQ belongs to both the 172.16.1.0/24 and 172.16.2.0/24 subnets with IP addresses of 172.16.1.3 and 172.16.2.3 respectively. Traffic between R1 and R2 must travel through HQ first. How should the serial interface on HQ be configured to complete the topology?
one multipoint subinterface
two point-to-point subinterfaces
with the physical interface configured with two ip addresses
one IP address on a point-to-point subinterface and one IP address on the physical interface

ccna 4 chapter 3 answers 2013

tags ccna 4 chapter 3 answers 2013,ccna 4 chapter 3 answers,ccna 4,cisco,ccna 4 chapter 3

ccna 4 chapter 9

1
Which two statements describe factors that influence the layout of a
proposal? (Choose two.)

Proposal layouts are required to use sans serif typefaces.

A specific proposal layout is followed when one is specified in the RFP.

A designer chooses the layout if a written RFP does not specify an outline.


The software that is used to create the proposal dictates the proposal layouts.

Proposal layouts are required to use a format that is designed by the network engineer.


2
What two items are typically included in the executive summary of a
proposal? (Choose two.)

project scope summary

high-level implementation plan

quotes for all needed equipment

technical requirements for the design

emphasis on the benefits that meet the goals of the customer


3
Which proposal section describes the intended routing protocol, security
mechanisms, and addressing for the planned network?

logical design
physical design

executive summary

implementation plan

network requirements


4
Which occurrence would indicate a failure of the design phase?

The incorrect model switches were ordered.

There is no customer signoff for task completion.

New requirements are identified after implementation begins.

The new network capacity is inadequate to support required traffic.


5
A network installation team is assigned to replace all core switches in an
existing data center. No other upgrades are planned. Which kind of installation is this?

a new installation

a fork-lift installation

a phased installation

a green field installation

ccna 4 chapitre 9
 
6
What service is provided Cisco standard warranty?

software application maintenance

replacement of defected hardware

next business day delivery of replacement parts

access to the Cisco Technical Assistance Center (TAC) 24 hours a day, 7 days a week


7
An upgraded version of the Cisco IOS has been purchased. However,
the CD arrived damaged. How will this loss be covered?

a hardware warranty

a software warranty

the Cisco SMARTnet Service

an additional service contract


8
A company informs the account manager that the installation of a new
edge router at the customer remote branch location cannot be done at the scheduled time
because of a large order that the branch office needs to complete. As a result, the end date of the
project must be adjusted to accommodate the additional time. What is the action should the
account manager take?

Cancel the order for the new edge router.

Work with designer to redesign the branch network.

Instruct the technician to complete the install of the router at on the date in the contract.

Adjust the timeline documentation to show the company how the delay will affect the
project completion date.



9
NetworkingCompany completes the installation of a network upgrade for
a retail customer. All of the onsite tests complete successfully and the customer IT staff approves
the results of the tests. The manager of the retail store contacts NetworkingCompany to inform
the company that the store will not pay for the upgrade until a recently purchased software
package is installed and tested on the network. Which two items that are contained in the
proposal can the account manager refer to when discussing this issue with the store manager?(Choose two.)

the project scope

the bill-of-material

the project timeline

the terms and conditions

the business goals of the customer

the evaluation of the current network


10
The operation of a new branch location network is delayed because a
VPN cannot be configured and established between the branch location and the main office. It is
determined that the router at the main office does not have enough memory and does not have
the correct Cisco IOS version image to support the VPN features. To prevent this delay, this
problem should have been identified and corrected during which part of the design project?

the preparation of the business case

the prioritizing of the technical goals

the characterization of the existing network

the implementation of the approved design


11
The NetworkingCompany team is tasked to prepare an implementation
schedule for a customer. It is determined that the new firewalls and wireless controllers that are
specified in the design cannot be delivered and installed within the agreed upon time frame. The
NetworkingCompany informs the customer of the problem. What two options can the
NetworkingCompany team take to ensure the success of the project? (Choose two.)

plan to add additional staff and resources to shorten the installation time after the new
equipment is delivered


eliminate redundancy in the design to reduce the amount of equipment that is needed

renegotiate a new time frame with the customer to accommodate the delay

delay the installation of the security devices and controllers until a later time

redesign the network to use only readily available equipment and software


12
AAA Financial Services Company is performing implementation planning
for a core switch upgrade. The company has 200 financial software programmers that work
billable hours during the week. They have critical, scheduled money transfer transmissions that
occur at hourly intervals every night. There are two, two-hour long IT maintenance windows
scheduled for software upgrades, one on Saturday and one on Sunday. The bank advertises
online banking as available 24 hours on business days and 21 hours on the weekends. However,
a network upgrade that is necessary to replace some switches is expected to take four hours.
Because of rack constraints, this time includes three hours to remove the old switches before the
new switches can be installed and one hour to test the logical configuration. How should the
implementation scheduling be handled

Defer the software upgrades. Use the Saturday window to perform the hardware
installation. Use the Sunday window to perform the logical testing.

Coordinate and publish a separate four-hour downtime during Friday to perform the
complete switch installation and testing process. Use the Saturday and Sunday windows to
correct any outage problems after the Friday window.

Coordinate and publish two, four-hour downtimes incorporating the published Saturday
and Sunday windows. Defer any software upgrades until the new network is proven to be working
correctly with the old software. Use the Sunday window as a fallback scheduling period if there
are problems necessitating backing out of the Saturday window.

Coordinate and publish an eight-hour downtime incorporating the Saturday window. This
will allow four hours for installation and logical testing, one hour for troubleshooting and decision,
and three hours to roll back to the previous configuration if the new switching cannot pass the
logical testing. Defer any software upgrades until the new network is proven to be working
correctly with the old software.



13
Included in a Bill of Materials (BOM) for a SOHO wired implementation is
a Cisco 2811 router, Catalyst 2560 switch, four PCs, three laptops, and a networked printer.
Wireless LAN capability will be implemented on this network. Which two equipment types must be
added to the BOM to implement this request? (Choose two.)

DNS server

LAN switch

wireless NICs

DHCP server

wireless access points


14
A customer has just taken delivery of a Cisco 2811 router and Catalyst
3560 switch. Included with the purchase is the SMARTnet Service. Which two resources are
included with SMARTnet Service? (Choose two.)

signature file updates

technical support from TAC

maintenance releases for OS


software application major releases

software application maintenance and minor releases


15
A Cisco 1841 router has been purchased without an agreement for
SMARTnet Service. What two items are guaranteed under the standard warranty? (Choose two.)

access to TAC

replacement of defective physical media

advanced replacement of hardware parts

access to a renewable standard warranty contract

under normal use, replacement of defective hardware



16
Upon completion of a proposal, a network design team must sell their
ideas to two key stakeholders. Who are these two stakeholders? (Choose two.)

customers

licensing boards

cabling contractors

internal management

project implementation team


17
What are two important guidelines when creating a slide presentation for
a meeting with a customer? (Choose two.)

Use all capital letters on words and phrases when possible for added emphasis.

Provide varied background graphics to enhance viewer interest.

Use contrasting colors for background and text to aid visibility.

Change fonts frequently to denote differences in subject matter.

Use bulleted text to lead the discussion.



18
In order to finalize a project proposal, an account manager of a
networking company creates the terms and conditions section. What are two clauses that should
be included in this section? (Choose two.)

cost summary

installation steps

change order procedures

problem resolution process


maintenance contract quotation


19
Which two items will a systems engineer include in an implementation plan? (Choose two.)

references to design documents

the business goals of the customer

diagrams of the existing traffic flows

the steps to install and test the network

cost of each network device and component


20
Which statement describes a phased installation into an existing network?

A phased installation generally takes less time and expense than a green-field installation.

A phased installation is not suitable for large, multi-site network installations or upgrades.

A phased installation requires detailed planning in order to avoid disruption of user services.
A phased installation involves building an entire replacement network and migrating users
over to it.
tag: ccna 4 chapter 9 answers,ccna 4,ccna 4 chapter 9 ,chapter 9 ccna 4,ccna,cisco,ccna 4,ccna 2,ccna 4 chapter 9 answers